Membership is FREE – with unlimited access to all features, tools, and discussions. Premium accounts get benefits like banner ads and newsletter exposure. ✅ Signature links are now free for all. 🚫 No AI-generated (LLM) posts allowed. Share your own thoughts and experience — accounts may be terminated for violations.

EV1 datacenter evacuated

Status
Not open for further replies.

MediaHound

Former DNF Admin
Legacy Exclusive Member
Joined
Feb 25, 2004
Messages
4,162
Reaction score
7
EV1 just had a major electrical incident and emergency services are on site there now. A lot of servers are offline. Hope nobody got hurt.
 

copper

Level 9
Legacy Exclusive Member
Joined
Mar 11, 2006
Messages
2,507
Reaction score
30
Yup.
I have server there and it's offline atm :(
Data center transformer was on fire.
 

draggar

þórr mjǫlnir
Legacy Exclusive Member
Joined
Dec 26, 2007
Messages
7,357
Reaction score
223
EV1? Google only shows Chevy (or Ford?) hybrid cars (well, the first page)
 

copper

Level 9
Legacy Exclusive Member
Joined
Mar 11, 2006
Messages
2,507
Reaction score
30
Former EV1 - It's part of ThePlanet.com now
If I remember correctly, EV1 started offering ded servers
at real bargain prices and grew super fast.
 

draggar

þórr mjǫlnir
Legacy Exclusive Member
Joined
Dec 26, 2007
Messages
7,357
Reaction score
223
Ah, that's not good. Would that be why the site was a little iffy earlier today? (Afternoonish)?
 

copper

Level 9
Legacy Exclusive Member
Joined
Mar 11, 2006
Messages
2,507
Reaction score
30
Ah, that's not good. Would that be why the site was a little iffy earlier today? (Afternoonish)?
Which site? yours?
You have server at ThePlanet?

My server at ThePlanet is down for more than 3 hours :(
 

MediaHound

Former DNF Admin
Legacy Exclusive Member
Joined
Feb 25, 2004
Messages
4,162
Reaction score
7
DNForum is not hosted there.
Here's some more info:
Dear Valued Customers:

This evening at 4:55 in our H1 data center, electrical gear
shorted, creating an explosion and fire that knocked down three walls
surrounding our electrical equipment room Thankfully, no one was
injured. In addition, no customer servers were damaged or lost.

We have just been allowed into the building to physically inspect the
damage. Early indications are that the short was in a high-volume
wire conduit. We were not allowed to activate our backup generator
plan based on instructions from the fire department.

This is a significant outage, impacting approximately 9,000 servers
and 7,500 customers. All members of our support team are in, and all
vendors who supply us with data center equipment are on site. Our
initial assessment, although early, points to being able to have some
service restored by mid-afternoon on Sunday. Rest assured we are
working around the clock.

We are in the process of communicating with all affected customers.
we are planning to post updates every hour via our forum and in our
customer portal. Our interactive voice response system is updating
customers as well.

There is no impact in any of our other five data centers.

I am sorry that this accident has occurred and apologize for the impact.

Sincerely,

Douglas J. Erwin
Chairman & Chief Executive Officer

Status updates are here each hour:
http://forums.theplanet.com/index.php?showtopic=90185
 

MediaHound

Former DNF Admin
Legacy Exclusive Member
Joined
Feb 25, 2004
Messages
4,162
Reaction score
7
Status update:
Dear Valued Customers:

As previously committed, I would like to provide an update on where we stand following yesterday's explosion in our H1 data center. First, I would like to extend my sincere thanks for your patience during the past 28 hours. We are acutely aware that uptime is critical to your business, and you have my personal commitment that The Planet team will continue to work around the clock to restore your service.

As you have read, we have begun receiving some of the equipment required to start repairs. While no customer servers have been damaged or lost, we have new information that damage to our H1 data center is worse than initially expected. Three walls of the electrical equipment room on the first floor blew several feet from their original position, and the underground cabling that powers the first floor of H1 was destroyed.

There is some good news, however. We have found a way to get power to Phase 2 (upstairs, second floor) of the data center and to restore network connectivity. We will be powering up the air conditioning system and other necessary equipment within the next few hours. Once these systems are tested, we will begin bringing the 6,000 servers online. It will take four to five hours to get them all running.

We have brought in additional support from Dallas to have more hands and eyes on site to help with any servers that may experience problems. The call center has also brought in double staff to handle the increase in tickets we're expecting. Hopefully by sunrise tomorrow Phase 2 will be well on its way to full production.

Let me next address Phase 1 (first floor) of the data center and the affected 3,000 servers. The news is not as good, and we were not as lucky. The damage there was far more extensive, and we have a bigger challenge that will require a two-step process. For the first step, we have designed a temporary method that we believe will bring power back to those servers sometime tomorrow evening, but the solution will be temporary. We will use a generator to supply power through next weekend when the necessary gear will be delivered to permanently restore normal utility power and our battery backup system. During the upcoming week, we will be working with those customers to resolve issues.

We know this may not be a satisfactory solution for you and your business but at this time, it is the best we can do.

We understand that you will be due service credits based on our Service Level Agreement. We will proactively begin providing those following the restoration of service, which is our number priority, so please bear with us until this has been completed.

I recognize that this is not all good news. I can only assure you we will continue to utilize every means possible to fully restore service.

I plan to have an audio update tomorrow evening.

Until then,

Douglas J. Erwin
Chairman & Chief Executive Officer
 

beggers

Level 4
Legacy Platinum Member
Joined
Sep 27, 2002
Messages
115
Reaction score
0
We're still down after two days. :(
 

copper

Level 9
Legacy Exclusive Member
Joined
Mar 11, 2006
Messages
2,507
Reaction score
30
My server is back online, but, still not 100% :(
 

MediaHound

Former DNF Admin
Legacy Exclusive Member
Joined
Feb 25, 2004
Messages
4,162
Reaction score
7
Latest email -
Dear Customer,

Late last night, I told you we hoped to have power to the 6,000 servers in Phase 2 of our H1 data center by midnight, with all servers up by early morning. I am glad to say we came close, just a few hours after sunrise. At this time, 100% of our servers in Phase 2 have power, and our technicians are working with customers on any remaining server issues. We are confident all remaining issues will be resolved shortly.

I also explained the significant challenge we faced in the other phase where the actual explosion occurred. Our team came up with a creative way to restore power quicker than the 4-5 day outage. We decided not to wait for equipment for the electrical room completely, opting instead for a temporary solution to get power to the 3,000 servers. That solution involves using generator power for the next 10 -12 days until all the new equipment arrives to rebuild the electrical room for Phase 1. I explained that we expected to have a temporary solution in place by midnight tonight, with servers powered up tomorrow. The good news is that as you read this letter, the power is restored, and the temporary solution is in effect. Within the next two hours, the remaining 3,000 servers have power. We have overstaffed our data centers again to help during this initial power up.

This now leaves us facing step two of this process, which requires getting all of the equipment delivered and then rebuilding the electrical room to its original standard. To make the cutover to the rebuilt electrical room, the operations group believed it would take a maintenance outage of 24-48 hours. I have good news on that front. It's not perfect, but at present we now believe the maintenance window will be just 4-6 hours. That's still too long, and we will continue this week to find ways to reduce the time. Given that there will be some outage for the cutover, we will execute this step at midnight on a Saturday, either June 7 or June 14. We want to pick the most appropriate time to minimize impact to you.

I must admit that I am amazed. We are almost 18 hours ahead of schedule with this phase, thanks to our great suppliers and of course the great folks working here at The Planet. This could never have happened without the help of both, and I want to thank all of them.

There is still more work to do, but the progress is terrific. We will continue to work any and all customer issues, and we face the challenge of putting the permanent power fix in place for Phase 1. Nonetheless, there is still good news based on what I told you last night.

As each hour passes, we learn more and more. Please give us the time to continue our planning. We will provide you with information as we have it.

Until tonight's update ...

Douglas J. Erwin
Chairman & Chief Executive Officer
 

Relationships

DNF Regular
Legacy Exclusive Member
Joined
Mar 24, 2003
Messages
1,091
Reaction score
1
Mine is still offline even thought it is at phase 2... :(
 